Utica UB90125 Installationshandbuch

Stöbern Sie online oder laden Sie Installationshandbuch nach Warmwasserbereiter & Kessel Utica UB90125 herunter. Utica UB90125 Installation manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 44
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
P/N 240004826U, Rev. B [08/11]
UB90 125-200 GAS-FIRED, DIRECT VENT,
CONDENSING, HOT WATER BOILER
INSTALLATION, OPERATION &
MAINTENANCE MANUAL
An ISO 9001-2008 Certified Company
Utica Boilers
2201 Dwyer Avenue, Utica NY 13501
web site: www.ecrinternational.com
Seitenansicht 0
1 2 3 4 5 6 ... 43 44

Inhaltsverzeichnis

Seite 1 - MAINTENANCE MANUAL

P/N 240004826U, Rev. B [08/11]UB90 125-200 GAS-FIRED, DIRECT VENT, CONDENSING, HOT WATER BOILERINSTALLATION, OPERATION & MAINTENANCE MANUALAn

Seite 2 - SAFETY SYMBOLS

10! CAUTIONCopper supply and return piping must not be installed directly into aluminum boiler section castings due to galvanic corrosion between dis

Seite 3

11NOTE: When zoning with circulators, the furnished circulator pump should be used as one of the zone pumps. Each stripped end of the electrical wires

Seite 4 - Figure 1 -Boiler Jackets

12Condensate Drain RequirementsCondensate drain line to be pitched down to fl oor drain at minimum of ¼” per foot (21mm/m). External condensate pump (n

Seite 5 - BEFORE INSTALLING THE BOILER

13Connections And TerminationNOTICETo prevent damage to gas burner and ensure proper operation of unit, installer must clean and remove all shavings f

Seite 6

14InstallationAttach combustio1. n air intake piping to supplied Fernco 2” coupling on CVI gas valve. Attach vent piping to furnished 2” CPVC vent te

Seite 7

15Check Gas SupplyGas pipe to your boiler must be correct size for length of run and for total BTU per hour input of all gas utilization equipment con

Seite 8 - Figure 4 - Concentric Vent

16! WARNINGTurn off electrical power at fuse box before making any line voltage connections. Follow local electrical codes.All electrical work must c

Seite 9 - PLACING THE BOILER

17AVOID THE FOLLOWINGDead Spots CornersAlcovesBehind doorsCold SpotsConcealed pipes or ductsStairwells - draftsUnheated rooms on the other side of the

Seite 10 - NEAR BOILER PIPING

1823GW32Y1BK1BKGW(PS-122)LWCOYWGYBKON/OFF SWITCHNEUTRAL (L2)HOT (L1)GROUNDW24V THERMOSTAT60 HZ, 1 Ø120 VACRPUMPCIRCULATORCOMMONWVAC12024 VACYEAEF03801

Seite 11

19LWCO(PS-122)HIGH LIMITFLAMEP3-4THERMOSTATP3-7RWP3-91013-10 CONTROLP1-2CONTROLAQUASTATP3-3P3-6P3-1(MANUAL RESET)SAFETY SWITCH CASTING TEMPERATURE+ 0.

Seite 12

2H90 125200 CAST ALUMINUM BOILERSAFETY SYMBOLS! DANGERIndicates a hazardous situation which, if not avoided, will result in death, serious injury.!

Seite 13 - COMBUSTION AIR AND VENT PIPE

20This section provides a brief description of the key controls and accessories found in this boiler.See, “Troubleshooting,” page 33 in this installat

Seite 14

21Differential Pressure SwitchesThe diaphragm type differential pressure switches are connected by vinyl tubing to the gas valve and the air inlet con

Seite 15 - Figure 12 - Gas Piping

22Water Treatment And Freeze ProtectionConsult local water treatment specialist for 1. recommendations if your water pH levels are below of 7.0 or har

Seite 16 - ELECTRICAL WIRING

23Open the zone service valve on the supply pipe for the 2. fi rst zone. Open the purge valve on the fi rst zone. Feed water will fi ll the zone, pushing

Seite 17

24STARTUPNOTICEIf burner appears to pulsate during ignition: Turn off boiler power and shut off gas supply to the boiler.1. Take the burner assembly

Seite 18

25Verify Proper Sequence Of OperationThe sequence can be followed via the diagnostic indicator lamps on the Integrated Boiler Control in Figure #16 (

Seite 19

26Inspect Venting & Air Intake SystemOperate the boiler and verify that all vent/air intake connections are gas-tight and water-tight. Repair any

Seite 20 - CONTROLS AND ACCESSORIES

27Set Thermostat To Desired TemperatureSet thermostat to desired room temperature and observe several complete cycles to verify proper operation.Final

Seite 21

28NOTICEMaintenance as outlined below can be performed by the owner unless otherwise noted.The acidic nature of fl ue gasses condensing on the aluminum

Seite 22

29Annual Shut Down Procedure (End Of Each Heating Season)Follow the instructions in “To Turn Off Gas To 1. Appliance” page 23 of this manual.If heati

Seite 23

3NOTICERead and understand the following instructions completely before installing.IntroductionThis appliance is a gas-fi red direct vent cast aluminum

Seite 24

30SERVICE HINTSDETAILED SEQUENCE OF OPERATION

Seite 25 - SEQUENCE OF OPERATION

31DRAFT INDUCER TEMPERATURE SAFETY SWITCHif dra inducer temperature reaches temperature safety switch set-point, safety switch contacts open immedia

Seite 26 - Btuh Input Rate =

32End Of Normal Sequence Of OperationThermostat ends call for heat.Gas valve and circulator pump are de-energized, valve and fl ame lights go out.Blowe

Seite 27

33IMPORTANT Initial Service ChecksBefore Troubleshooting:1. Make sure that the circuit breaker is on or fuse is A. OK at the electrical panel.Make sur

Seite 28 - MAINTENANCE AND CLEANING

34System StatusThe indicator lights track the operating sequence. If the system locks out, the lights indicate the point in the sequence of operation

Seite 29

35

Seite 30 - SERVICE HINTS

36Troubleshooting Chart 2  !"

Seite 31

37Troubleshooting Chart 3CHECK FOR VAC BETWEEN TERMINALS 1 AND 3 AT CONNECTOR CN4 ON IBCNO NOBLOWER STARTS REPLACE IBCCHART 1OPENPURGE LIGHT ON?NOYESI

Seite 32

38Troubleshooting Chart 4IGNITER/SENSOR WARMSUP AND GLOWS YELLOW/ORANGEDURING 20 SECOND WARM UPCHART 3YESNOCHECK FOR 120 VAC BETWEEN TERMINALS 1 AND 2

Seite 33 - TROUBLESHOOTING

39! $$*)%&#% $$ ($%# $'' # #$$#$$'%&#'&ap

Seite 34

4TABLE #1 - SEA LEVEL RATINGS (NATURAL AND PROPANE GASES)ModelInput (MBH)(1)Heating Capacity(MBH)(1)(2)Net I=B=R Rating (MBH)(1)Shipping Weight (lbs.)

Seite 35

40Troubleshooting Chart 6RUNS FOR 25-50 SECONDS, THEN TURNS OFF.CHECK FIRING RATE OF UNIT.IS UNIT FIRING AT THE CORRECT RATE?NODOES THE UNIT USE LP GA

Seite 36

41The differential air pressure switch is safety device which will prevent boiler from fi ring if there is air intake, boiler heat exchanger or vent bl

Seite 37

42This Page Intentionally Left Blank

Seite 38

43INSTALLATION AND CHECK-OUT CERTIFICATEBoiler Model ___________ Serial # _____________ Date Installed___________Measured BTU/HR input ____________

Seite 39

UTICA BOILERS2201 Dwyer Avenue Utica NY 13501web site: www.ecrinternational.com

Seite 40

5TABLE #3 - LP GASNominal Input200,000175,000 150,000 125,000Vent Lengths Vent Lengths Vent Lengths Vent LengthsAltitude Min. Max Min. Max Min. Max Mi

Seite 41

6In the State of Massachusetts:This product must be installed by a licensed plumber • or gas fi tter.When fl exible connectors are used, the maximum • l

Seite 42

7OVERHANG12" MINIMUM90°VENT12" SEPARATIONBETWEEN BOTTOM OFCOMBUSTION AIR INTAKEAND BOTTOM OF VENTMAINTAIN 12" MINIMUM CLEARANCE ABOVE H

Seite 43

83” Diameter PVCVent/Exhaust1½”4½” Dia.31⅞”AABBCCDEFGG3” Diameter PVCIntake/Combustion Air46¾”Dimension1³⁄16”DEFDimensionCombustion Air/Vent Pipe Requ

Seite 44 - Utica NY 13501

9Foundation RequirementsBoiler must be placed on level surface. Boiler is NOT to be installed on carpeting. NOTICEIf boiler is not level condensate dr

Kommentare zu diesen Handbüchern

Keine Kommentare