Utica MGB150 Bedienerhandbuch

Stöbern Sie online oder laden Sie Bedienerhandbuch nach Warmwasserbereiter & Kessel Utica MGB150 herunter. Utica MGB150 Instruction manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 32
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
PRODUCT LITERATURE
MODELS
XEB-2
XEB-3
XEB-4
XEB-5
XEB-6
XEB-7
This boiler cannot be used with all types of
chimneys. Read these instructions carefully
before installing.
These Gas-Fired Hot Water Boilers are low pressure, sectional cast
iron boilers Design Certified by C.S.A. (Canadian Standards
Association) for use with Natural and Propane Gases. They are
constructed and hydrostatically tested for a maximum working pressure
of 50 psi in accordance with A.S.M.E. Boiler and Pressure Vessel
Code Section IV Standards for cast iron heating boilers.
INSTALLATION INSTRUCTIONS
These instructions must affixed on or adjacent to the boiler.
Gas-Fired
Hot Water
Induced Draft
BOILERS
DUNKIRK BOILERS
DUNKIRK, NEW YORK 14048 - AREA CODE 716 366 - 5500
MEMBER: The Hydronics Institute
XEB
SERIES
WARNING: Improper installation, adjustment, alteration, service or maintenance can cause injury
or property damage. Refer to this manual. For assistance or information consult a qualified installer,
service agency or the gas supplier.
Seitenansicht 0
1 2 3 4 5 6 ... 31 32

Inhaltsverzeichnis

Seite 1 - Induced Draft

PRODUCT LITERATUREMODELS XEB-2 XEB-3 XEB-4 XEB-5 XEB-6 XEB-7This boiler cannot be used with all types ofchimneys. Read these instructi

Seite 2 - Boiler Ratings and Capacities

FIG. 8 - TYPE B GAS VENT9For boilers for connection to gas vents orchimneys, vent installations shall be inaccordance with Part 7, Venting Equipm

Seite 3 - Before You Start

10REMOVING EXISTING BOILER FROMCOMMON VENTING SYSTEMWhen an existing boiler is removed from a commonventing system, the common venting system islik

Seite 4 - Locating the Boiler

FIG. 9 - HORIZONTAL VENTINGINDUCED DRAFT HIGH EFFICIENCY BOILERS3$57180%(5'(6&5,37,21VLGH:DOO9HQW+RRG7MHUQOXQG9

Seite 5 - Fresh Air for Combustion

12Horizontal Venting Instructions1. These boilers may be vented horizontally asshown in Fig. 9. The vent pipe is pitched downfrom the boiler to the

Seite 6

c) For single wall pipe through non-combustiblewalls, the hole through the wall need only belarge enough to maintain the pitch of the ventpipe, and pr

Seite 7 - Installation-System Piping

B. For Heat-Fab Saf-T-Vent stainless steelvent pipe use a high temperature red siliconesealant rated for 500°F The outside of themale end and ins

Seite 8 - WITH REFRIGERATION SYSTEM

3) Insert the male end of one into the female endof the other. Push the pipe together so thefemale end rests up against the stop bead ofthe male end.4

Seite 9

d) ProTech stainless steel vent piping requiresone loose fitting FasNSeal support strap(#FSSH) for every 6' of horizontal vent.10. If the horizon

Seite 10

Gas Supply PipingCHECK GAS SUPPLYThe gas pipe to your boiler must be the correct size for thelength of the run and for the total BTU per hour input

Seite 11 - COMMON VENTING SYSTEM

Electrical WiringAll electrical work must conform to local codes aswell as the National Electrical Code, ANSI/NFPA-70,latest revision. In Canada, elec

Seite 12 - FIG. 9 - HORIZONTAL VENTING

1Boiler Ratings and CapacitiesDESIGN CERTIFIED FORNATURAL AND PROPANE GAS FIG. 1*MBH = 1,000 Btuh = British Thermal Unit Per HourBoilers are equipped

Seite 13

INTERMITTENT IGNITIONIF ANY OF THE ORIGINAL WIRE AS SUPPLIED WITH THIS APPLIANCE MUST BE REPLACED,IT MUST BE REPLACED WITH TYPE 105° C THERMOPLASTIC W

Seite 14

RELIEF VALVEYou must have a relief valve on your boiler. Waterexpands as it is heated. If there is no place for thewater to expand into, water pressur

Seite 15

21WATER TEMPERATURE CONTROLThe water temperature limit control in the relay isadjustable and may be set as necessary. It maybe set as low as 140° F, o

Seite 16

Starting Your BoilerHOW A HOT - WATER SYSTEM OPERATESYour entire heating system (boiler, piping and radiationunits) is filled with water. As the water

Seite 17

1. Set the thermostat to lowest setting.2. Turn off all electric power to the appliance.3. This appliance is equipped with an ignition devicewhich aut

Seite 18 - Gas Supply Piping

24FIG. 15 - AUTOMATIC GAS VALVEChecking and AdjustingFIG. 14 - PILOT FLAME ADJUSTMENTRECOMMENDED BOILER WATER TEMPERATURES Type of Heating Unit

Seite 19 - Sequence of Operation

Maintaining Your BoilerBURNERSA visual check of the pilot and main burner flamesshould be made at least once each year, preferablyat the beginning of

Seite 20

26 FIG. 16BLOWERThe blower motor features a permanently lubricatedball bearing construction. Lubrication is notrequired.CIRCULATOR PUMP ISOLATIO

Seite 21

27Service HintsYou may avoid inconvenience and service calls by checking these points before you call for service.FOR YOUR SAFETYWHAT TO DO IF YOU S

Seite 22 - PRESSURE SWITCH

Repair Parts28NATURAL GAS BURNER & MANIFOLD PARTSTHIS IS A REPAIR PARTS LIST - NOT A PACKING LISTNOTE: Actual gas valve may lookdifferent than gas

Seite 23 - Starting Your Boiler

Check to be sure you have the right size boiler beforestarting the installation. See rating and capacity tableon previous page. Also be sure the new b

Seite 24

Repair PartsFOR USE WITH NATURAL GAS ONLYNOTE: Actual gas valve may lookdifferent than gas valve shown29NATURAL GAS BURNER & MANIFOLD PARTSTHIS IS

Seite 25 - Checking and Adjusting

Repair Parts303$57180%(56)25

Seite 26 - Maintaining Your Boiler

14683001 Rev 2, July 2003Repair PartsBOILER CONTROLS AND PIPINGNOTE: The circulator and ball valves do notcome pre-installed..H\1R'HVFULSWL

Seite 27 - CLEANING YOUR BOILER AND

If your boiler is part of a planned heating system,locate it where shown on your plan. If boiler is tobe part of an existing system, it is usually bes

Seite 28 - Service Hints

You must provide for enough fresh air to assureproper combustion. The fire in the boiler usesoxygen. It must have a continuous supply. The airi

Seite 29 - Repair Parts

FIG. 3A - FRESH AIR DUCT CAPACITIES (Btuh)FIG. 3B - FRESH AIR DUCT CAPACITIES (Btuh)FIG. 4 - FRESH AIR DUCT CAPACITIES (Btuh))UHH )UHH )U

Seite 30

6FIG. 5 - FORCED HOT WATER TYPICAL PIPINGInstallation-System Piping1. Place boiler in the selected location (as nearchimney as possible). Your

Seite 31

FIG. 6 - FORCED HOT WATER TYPICAL PIPINGWITH ZONE CONTROL VALVEFIG. 7 - PIPING ARRANGEMENTSFOR BOILER WHEN USED IN CONNECTIONWITH REFRIGERATION

Seite 32

8Chimney and Vent Pipe ConnectionCHECK YOUR CHIMNEYThis is a very important part of your heating system.It must be clean, the right size, properly

Kommentare zu diesen Handbüchern

Keine Kommentare